Strip foundations

Excavation muck away and concreting of strip foundations.

Ground beams

Installation of reinforced concrete ground beams over piled or pad foundations.

Drainage

Install new drainage or repair existing drainage – both foul and rainwater systems.

Concrete slabs

Installation of concrete slabs as a base for outbuildings, sheds or conservatories.

Block and beam floor installation

Including over site excavation, beam placement and block installation.

Demolition

Including interior demolition, selective demolition, dismantling and deconstruction and total demolition.

Site clearance

Clear away rubbish, waste or other unwanted items
from your building site.

Driveway or hard standing prep

Preparation for the installation of a driveway or hard standing area.

Piled raft slabs

Piled raft foundations for situations where ground conditions are susceptible to heave, subsidence or settlement.

Piling matt

Installation of a working platform to provide a stable surface for piling rigs or other heavy plant machinery.

RC slabs

Reinforced concrete slabs.

Site hoarding

Installation or removal of site hoarding for your construction project.

Site prep

Clearing, levelling and preparing your building site.

Soakaways

Installation of underground soakaway crates designed to hold surface water until it can drain into the subsoil.

Oversite prep & floor slabs

Complete over site installation for extensions or residential and commercial builds from excavation to preparation and concreting.

Suspended concrete slabs

Installation of designed RC slabs to the engineer’s specifications.

Pad foundations

Foundations to support localised loads or columns.

Underground service ducts

Underground service ducts for cables and pipes.

Underpinning

Strengthening the foundations of an existing building structure.

Waterproof concrete walls

Installation of waterproof concrete walls.

© Copyright O'Brien Groundwork, 53 Thorndon Avenue, West Horndon, Brentwood, CM13 3TT